You don't have javascript enabled. Good luck with that.
Pencarian
Halte Bus Transjakarta Terintegrasi Dengan MRT Tunggu Pembangunan Rampung
.
photo Ilustrasi - Beritajakarta.id

Integrated Bus Stop-MRT Project Will Begin After Construction

Jakarta Transportation Dept is about to review the integrated Transjakarta bus stops with Mass Rapid Transit (MRT) after its construction has reached 80 percent.

Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent

"This is under construction process. Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent," he stated, Monday (4/11).

By doing so, it would smoothen its project process.

Protocol Road Repair will Be Done After MRT

"The easy thing is relocating the bus stops that we want," he uttered. 

Linked News
Popular News indeks
  1. Five Transjabodetabek Routes will Be Added to Tackle Traffic Congestion

    access_time09-05-2025 remove_red_eye429 personDessy Suciati
  2. Munjirin Optimizes Physical and Non-Physical Development in East Jakarta

    access_time08-05-2025 remove_red_eye352 personNurito
  3. Kampung Bayam Madani Farmer Group Harvests 138 Kilograms of Agriculture and Fishery Commodities

    access_time05-05-2025 remove_red_eye289 personAnita Karyati
  4. Budi Awaluddin Pushes Digital Transformation towards Jakarta

    access_time07-05-2025 remove_red_eye267 personAldi Geri Lumban Tobing
  5. BPBD Issues Early Warning of Potential Landslides in Jakarta

    access_time08-05-2025 remove_red_eye257 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik